Need a Dubai tenancy contract in the next 5 minutes? Here is the fastest legal path. Every step timed.
3-minute creation timeline
0:00
Open tenancycontract.com
Homepage loads. Click Generate. No signup.
0:15
Upload title deed
Drag drop or phone photo. AI reads in 5 seconds.
0:45
Upload both Emirates IDs
Front + back. AI extracts data.
1:15
Review auto-filled fields
Green = confident. Yellow = verify.
1:45
Enter rental terms
Rent, dates, deposit, cheques.
2:30
Add Additional Terms (optional)
Common defaults available.
2:45
Click Generate PDF
2-3 seconds. Instant download.
3:00
Done
Ready to print and sign.
What happens next
3:00
Print two copies
A4 colour.
3:10
Both parties sign every page
Wet-ink blue or black.
3:15
Open Dubai REST app
Sign in with UAE Pass.
3:20
Register Ejari
Upload contract + IDs + title deed + DEWA bill.
4:00
Certificate issued
15-30 minutes. Download.
Total investment
- Contract: 3 minutes
- Sign + Ejari upload: 15 minutes
- Ejari processing: 15-30 minutes
- TOTAL: 45 minutes end-to-end
Nothing else is faster
- Typing centre: 1-2 hours just for contract
- Manual blank template: 20-30 minutes typing
- Lawyer draft: days
- In-person Ejari: 1-2 hours queue
For the full workflow, see create complete guide.
People also ask
Really 3 minutes?
Yes - measured. AI extraction under 5 seconds per document, terms entry 45-60 sec, PDF generation 2-3 sec. Total <3 min typical case.
What if documents fail to upload?
Try different format, better lighting, clearer photo. All corners must be visible.
Really no signup?
Correct - no account, no email, no phone. Generate anonymously.
Same quality as typing centre?
Identical DLD v1.4 PDF, same legal standing, same Ejari acceptance.
How long total to Ejari certificate?
45 minutes: 3 min contract + 15 min sign + 15-30 min Ejari.